Developer

APP development

Home>Developer

Healthcare Electronic Medical Record Integration System

Date:2025-06-18   Visits:27
1. Project Background & Challenges
Client Situation:

"17 branch hospitals were using 8 different HIS systems from various vendors. Medical records were stored in silos, resulting in an average 4-hour delay for cross-hospital record retrieval. There was also a high risk of patient data breaches."
— Information Department, Kangtai Medical Group

Key Pain Points:


  1. Data interoperability across heterogeneous systems (SQL Server/MySQL/Oracle mix)

  2. Medical data privacy protection (compliant with HIPAA/GDPR)

  3. Synchronization consistency between offline records and real-time data



2. Technical Solution & Innovation

1. System Architecture

┌─────────────────┐     ┌─────────────────┐     ┌─────────────────┐ │  Hospital Portal │────►│  Unified Auth    │────►│  Blockchain      │ │  (Vue + Element) │     │  (OAuth2 + JWT)  │     │  (Hyperledger)   │ └─────────────────┘     └─────────────────┘     └─────────────────┘                             │                          │                             ▼                          ▼ ┌─────────────────┐     ┌─────────────────┐     ┌─────────────────┐ │  Data Integration│     │  Medical Record  │     │  Privacy Computing│ │  (ETL + Kafka)   │     │  Middleware      │     │  (Federated Learning)│ └─────────────────┘     └─────────────────┘     └─────────────────┘

2. Key Technical Implementations

Blockchain Proof-of-Existence:

Hyperledger Fabric-based consortium blockchain for medical record modification tracking.

Multi-source Data Fusion:
Unified medical record metadata model with real-time synchronization via Kafka.



3. Project Outcomes & Value

1. Key Metrics Comparison

MetricBefore OptimizationAfter OptimizationImprovement
Cross-hospital record retrieval time4+ hours<3 minutes-99.2%
Data consistency error rate5.3%0.15%-97.2%
Privacy breach risk levelHigh (Level 4)Low (Level 1)3 levels
Doctor daily efficiency80 records/day120 records/day+50%
2. Client Benefits




4. Technical Innovations



5. Implementation Details

  1. Phased Rollout:
    • Phase 1 (1-2 months): Data integration and model validation for 3 pilot hospitals.

    • Phase 2 (3-5 months): Expansion to 10 hospitals with blockchain-enabled features.

    • Phase 3 (6-8 months): Full integration across 20 hospitals, launch of research data platform.

  2. Training Program:
    • Tiered training courses for 300+ medical staff (basic operation/administrator/technical maintenance).

    • Online help center with 120+ video tutorials.

  3. Operation & Maintenance:
    • 7×24 monitoring platform (CPU/memory/blockchain node status visualization).

    • Quarterly disaster recovery drills (simulating blockchain node failures).



6. Related Resources


Prev:No more!

Next:E-commerce Intelligent Recommendation System Reengineering

No data found!
-->
切换中文 切换英文
Top